Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

September 11, 2023

May 8, 2024

111 Logsdon St

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

111 Logsdon St, Andrews, TX

Subscribe to View Full Documents

Installing all materials as shown in Appendix B as provided by the Owner including items listed in the proposal and materials, machinery, equipment, superintendence and labor for the installation of 52,635 LF of 20-inch Fusible PVC and associated appurtenances, including boring under Loop 1910 and installation of Tie-In Connections at Ave K , including other incidental items of work as called for in the specifications Bidders must submit a Cashiers or Certified Check issued by a bank satisfactory to the City of Andrews, or a Bid Bond from a reliable Surety company, payable without recourse to the order of the City of Andrews, in an amount not less than five percent (5%) of the largest possible bid submitted as a guaranty that the bidder will enter into a contract and execute bonds and guaranty in the forms provided within ten (10) days after notice of award of contract to him. Bids without the required Check or Bid Bond will not be considered. The successful bidder will be required to furnish a Performance Bond, and Payment Bond, and Warranty Bond each in the amount of the contract, written by a responsible Surety Company, authorized to do business in the State of Texas, and satisfactory to the Owner. Installing all materials as shown in Appendix B as provided by the Owner including items listed in the proposal and materials, machinery, equipment, superintendence and labor for the installation of 52,635 LF of 20-inch Fusible PVC and associated appurtenances, including boring under Loop 1910 and installation of Tie-In Connections at Ave K , including other incidental items of work as called for in the specifications. Direct questions in writing to Wendy Ruiz, at the office of City Engineer, or email wendy.ruiz@oei-eng.com. The City of Andrews reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the CITY OF ANDREWS for a period not to exceed 30 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. Perform Work in 240 calendar days TOTAL OPINION OF PROBABLE CONSTRUCTION COST $ 6,774,972.00

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.