Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

October 9, 2023

October 3, 2024

1350 W Van Alstyne Pkwy

Site Work

No Information to Display

$4,470,000.00

Public - State/Provincial

img_map_placeholder

1350 W Van Alstyne Pkwy, Van Alstyne, TX

Subscribe to View Full Documents

Proposals shall be accompanied by a certified or cashier's check on a state or national bank in an amount not less than five percent (5%) of the possible total of the bid submitted, payable without recourse to the Greater Texoma Utility Authority, or an acceptable bid bond for the same amount from a reliable surety company as a guarantee that the bidder will enter into a contract and execute required Performance and Payment Bonds within ten (10) days after notice of award of contract. The notice of award of contract shall be given to the successful bidder within ninety (90) days following the opening of bids. The successful bidder must furnish a Performance Bond upon the form provided in the amount of one hundred percent (100%) of the contract price, a material and labor Payment Bond upon the form provided in the amount of one hundred percent (100%) of the contract price, and a Maintenance Bond upon the form provided in the amount of one hundred percent (100%) of the contract price, from a surety authorized under the laws of the State of Texas to act as a surety on bonds for principals. The deadline to ask questions is 8/01/2023 12:00 PM CST A maximum of three hundred and sixty (360) calendar days will be allowed for construction. The right is reserved, as the interest of the Owner may require, to reject any and all bids, to waive any informality in the bids received, and to select bid best suited to the Owner's best interest. The project scope includes: Excavation, foundation construction, backfill, fabrication, erection, painting, site grading and clean-up for the 750,000 Gallon Composite Elevated Storage Tank Site paving and drainage improvements Water line improvements (Existing 6" DI & 8" PVC; and Proposed 8" and 12" PVC AWWA Pressure Rated Pipe) and connections between existing facilities and proposed facilities at Well Site #5 AMR System Exterior Site Lighting QA Expiration Date has changed from 8/1/2023 12:00:00 PM CST to 8/3/2023 12:00:00 PM CST

53 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.