Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2023

August 28, 2023

October 27, 2023

6000 Arthington Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

6000 Arthington Ave, Houston, TX

Subscribe to View Full Documents

Estimate: 150000-175000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work of the Contract is for construction of a reinforced concrete Hike and Bike Trail, including improvements to the existing backslope drainage swale system, installation of reflective delineators, and sodding. The project also includes installation and maintenance of erosion control devices. 1,343 SY Concrete Pedestrian Trail 300 CY Regrading of Existing Swales 3 EA Reflective Delineators 4,480 SF Bermuda Sod 1 LS Hydroseed of Disturbed Areas

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.