Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2023

November 6, 2023

May 6, 2031

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Wauwatosa, WI

Subscribe to View Full Documents

The project contemplated consists primarily of: o Demolition and abandonment of existing pavements, foundations, retaining walls and public utilities. o Soil remediation by excavation and off-site land filling of approximately 20,000 tons of contaminated soils. o Quarry stone streambank reconstruction along approximately 1,500 feet of the north bank and south bank of the Menomonee River. o Excavation, grading and on-site management of low-level contaminated soil along approximately 7 acres of the north bank floodplain of the Menomonee River, and construction of approximately 1,700 feet of earthen levees. o Construction of a 200 linear foot hybrid levee floodwall and 1,150 linear foot concrete floodwall. o Construction of approximately 6,400 feet of 12-inch to 72-inch storm sewer and 350 feet of 120" x 60" Combined Sewer Overflow, including manholes, inlets, cast-in-place structures, and lateral reconnections, four flap gates ranging from 24-inch to 60-inch, and including two undercrossings of the Canadian Pacific Railway tracks. o Construction of approximately 1,850 liner feet of 16-inch water main, including building services up to the right-of-way line, located on West State Street. o Construction of approximately 2,000 linear feet of concrete encased conduit for City of Milwaukee communication service located in West State Street. o Concrete pavement, asphalt, turf, and native vegetative restoration of all disturbed areas. For information regarding this project contact: Emily Neidhardt, eneidhardt@mmsd.com July 11, 2023 @ 1:30PM Vendor Q&A, registration required ALL questions related to this proposed contract, Pre-Bid Presentation, and/or Potential Bidders List must be directed in writing to Millie Neidhardt, Procurement Specialist, at eneidhardt@mmsd.com. Questions directed to other contacts at the District will not be recognized

55 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects