Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

July 10, 2024

3305 John F. Kennedy Blvd

Paving, Renovation, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

3305 John F. Kennedy Blvd, Union City, NJ

Subscribe to View Full Documents

The Work of Project is defined by the Contract Documents and consists of the following: 1. Salvage, removal and disposal of existing site improvements, as designated on the drawings, that include but are not necessarily limited to; clearing and grubbing, complete tree removal, excavation, fencing, concrete sidewalk, concrete curb,concrete plaza, concrete stairs, concrete walls, existing utility poles (coordinate with PSE&G). 2. Earthwork. Excavation for stairs, sidewalk, stormwater management structures and pipes, utility lines, and site grading. 3. Removal of rock if required to allow for necessary excavation. 4. Installation of concrete sidewalk, concrete stairs, stair handrails, concrete stair walls and footings, and concrete stair landings including colored and/or textured surfaces as designated and specified. 5. Installation of new site furnishings, such as benches, as specified or as shown on the drawings. 6. Installation of lighting fixtures, lighting fixture foundations, and electrical services required to deliver fully operational systems (coordinate with PSE&G). 7. Installation of security and soil erosion and sediment control measures, including but not limited to: temporary construction chain-link fence, stabilized construction entrance, silt fence, soil stockpile, inlet protection, and tree protection. 8. Preparation and installation of specified landscaped items, including but not limited to: bioretention plantings, seeded lawn, canopy trees, and understory trees. 9. Preparation and installation of stormwater management measures, including but not limited to: low-profile underdrain, level spreader, stormwater management trenches and relevant piping, outlet control structures, cleanouts, and geotextile fabric. 10. Acquisition of all necessary permit(s) from various agencies having authority. Q & A deadline: Jul 20, 2023 4:00:00 PM EDT

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects