Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 19, 2023

August 7, 2023

October 13, 2023

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Surrey, BC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Fire Alarm Renewals - 3 Building locations Berwick Memorial Centre - 2765 Osoyoos Crescent V6T 1X7 LARC - 2371 Main Mall, Vancouver, V6T 1Z4 LMHH - 2269 Lower Mall, Vancouver, V6T 1Z4 System installation, start-up testing, calibration, functional tests, integrated tests, performance testing, preparation of O&M manuals, demonstration and training, deferred and seasonal testing is the responsibility of the CM, Division 20 through 28 contractors and equipment suppliers/vendors., located at Berwick Memorial Centre, followed by LARC and LMHH. Documents can be obtained from https://ubc.bonfirehub.ca/portal

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.