Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 22, 2023

October 23, 2023

November 10, 2027

Chelsea St

Paving, Site Work

No Information to Display

$122,569,000.00

Public - State/Provincial

img_map_placeholder

Chelsea St, Boston, MA

Subscribe to View Full Documents

The work under this contract consists of the preservation of Bridge No. B-16-017=C-09-006 (4X0, 4WY), US 1 NB & US 1 SB over Chelsea Local Streets. The majority of the preservation work covers approximately 3000 feet of northbound roadway (lower level) and 3350 feet of southbound roadway (upper level) of US 1, along with approximately 950 feet of work at the Beacon Street Ramp and 2,300 feet of work at the Everett Avenue Ramp. The work to be performed consists of, but is not limited to, the following: 1. Erect temporary protective shielding/work platforms/containment as required to contain the flaking paint chips and to perform the work. 2. Place temporary barriers and other required temporary traffic controls along the lower level (US 1 NB), Beacon Street Ramp, and upper level (US 1 SB) in accordance with the Temporary Traffic Control Plan for Stage 1. 3. Full clean of existing steel on lower level mainline (US 1 NB), Beacon Street Ramp and upper level mainline (US 1 SB). Perform repairs to existing steel superstructure elements, and safetywalk elements at lower level mainline, Beacon Street Ramp and upper level mainline. Upon completion of steel repairs, full paint of the existing and new steel. Perform repairs to substructure elements. Replace the third and fourth paragraphs with the following Payment for extra work will be as provided in Subsection 9.03: Payment for Extra Work. The determination of the Engineer shall be final upon all questions concerning the amount and value of Extra Work (except as provided in Subsection 7.16: Claims of Contractor for Compensation. If the Contractor disputes the scope, cost or time associated with the executed Extra Work Order or the determination by the Engineer for requested extra work, then the Contractor must deliver to the Department written notice of a claim in accordance with Subsection 7.16: Claims of Contractor for Compensation. BRIDGE NO. B-16-017 = C-09-006 District: 6 Location: Boston - Chelsea Project Type: Painting - Structural MADOT - Structural Cleaning and Painting, Steel and Concrete Repairs on Tobin Bridge , B-16-017=C-09-006

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.