Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

August 14, 2023

October 13, 2023

5320 Gage Ave

Site Work

No Information to Display

$52,644.00

Public - City

img_map_placeholder

5320 Gage Ave, Bell Gardens, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

In general, the work to be performed or executed under these specifications consists of furnishing solar powered flashing LED stop signs and necessary incidental hardware. The LED signs will be installed by City forces and shall include all necessary appurtenances for mounting the LED signs to streetlights, U-channel sign posts, and square channel sign posts. The install flashing stop signs conforming to the technical requirements. The scope of work includes, but is not limited to performing the following work: - Furnishing complete solar powered flashing stop signs and mounting hardware - Furnishing associated documentations including user manuals - Packaging, shipping, and delivery of the solar powered flashing LED stop signs to the City Online Q&A Yes. Q&A Deadline 07/06/2023 2:00 PM (PDT) The City of Bell reserves the right, after opening bids, to reject any or all bids, or to make award to the lowest responsible and responsive bidder and reject all other bids; to waive any informality in the bidding; to accept any bid or portion thereof; and to take all bids under advisement for a period of sixty (60) calendar days. Bids will be compared based on Total Bid Price The Vendor shall submit a Request for Information (RFI) within five (5) business days of an event or question of fact arising under the Contract. The Engineer in charge of the project shall have ten (10) business days to respond to an RFI or any Submittal required to be made under Contract.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.