Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

January 1, 2024

April 22, 2024

3715 Vision Blvd

Renovation

No Information to Display

$1,200,000.00

Public - County

img_map_placeholder

3715 Vision Blvd, Orlando, FL

Subscribe to View Full Documents

A. Summary of Work: 1. Remove existing steam boiler, deaerator and feedwater system, heat recovery, boiler vent stack, hot water heater, chemical treatment, water softener, condensate receiver and all steam piping, steam valves and accessories and steam condensate piping within the boiler room. 2. Install two (2) new steam boilers and vent stacks, two (2) steam-to-hot water heat exchangers, deaerator and feedwater system, chemical treatment, water softener, condensate receiver, steam piping, pressure reducing valves and steam accessories and steam condensate piping within the boiler room. Add alternate for a domestic hot water storage tank. 3. Provide new supply steam 6 drip leg and steam trap assembly at the kitchen. 4. Provide new end-of-main steam condensate trap for the existing 4 steam line serving the steam kettles in the kitchen. 5. Provide new supply line (steam inlet) steam condensate trap for each of the existing eight (8) steam kettles in the kitchen. 6. Remove existing steam trap and provide new discharge (steam outlet) steam condensate trap for each of the existing eight (8) steam kettles in the kitchen. And connect condensate to new 2 condensate line to new condensate receiver. 7. Provide new kitchen condensate receiver to collect steam condensate from the 4-steam main and eight (8) steam kettles and pump condensate back to the boiler room. 8. Provide new JCI controllers and connect all new equipment to the existing Metasys Building Control System. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, July 10, 2023, at 5:00 pm EST. Respondents are instructed not to contact the initiating division directly. DEADLINE FOR QUESTIONS: July 10, 2023

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects