Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

January 16, 2024

August 4, 2026

825 39th Ave NE

Renovation, Site Work

No Information to Display

$26,587,000.00

Public - County

img_map_placeholder

825 39th Ave NE, Naples, FL

Subscribe to View Full Documents

The Work includes the construction of two Class 1 deep injection wells (DIW) and one dual zone monitoring well (DZMW). These DIWs will be utilized to dispose of off-specification quality reuse water from a water reclamation facility, and reverse osmosis (RO) concentrate from a water treatment plant (WTP). Above ground DIW features include a well containment/maintenance pad, wellhead piping and valving, and a well annulus pressure system. Electrical and instrumentation and control (I&C) features of the project will be constructed by others. Coordination activities, manpower, and responsibilities with electrical and I&C contractor are included in this contract. Contractor shall make all necessary connection points as required by the electrical and I&C contractor as needed for incorporation of the electrical & I&C project components. Information on electrical and I&C components are included herein for Contractor's information. All improvements shall be constructed in accordance with the Drawings and Specifications. See Specification Section 13_40_00 Deep Injection Wells and Dual Zone Monitoring Wells for below groundwork requirements. Question Deadline 08/25/2023 at 5:00 PM ET QA Deadline date changed from 08/07/2023 per addendum 4, If you require additional information, please post a question web site. Question Deadline 10/11/2023 at 5:00 PM ET

124 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.