Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 8, 2025

August 28, 2023

February 24, 2024

Multiple Locations

Site Work

No Information to Display

$600,000.00

Public - City

img_map_placeholder

Multiple Locations, Wrightsville, GA

Subscribe to View Full Documents

Any Contractor submitting a bid must be licensed by the State of Georgia and be fully insured and bonded. In general, construction consists of an estimated total of 7,897 feet of 8" main sewer rehabilitation improvements proposed (6,410 LF pipe-burst plus 1,487 LF CIPP = 7,897 LF). There is an estimated 2,165 LF of 4" service pipe proposed to replace existing pipe either by pipe-bursting, static pull or open cut installation methods, installation of manholes & cleanouts, manhole rehabilitation (231 VF), erosion control, grassing and all other associated appurtenances necessary for a complete and operational project in the target area. Any Contract or Contracts awarded under this Advertisement for Bids are to be funded through the Department of Community Affairs. "This is a Section 3 Covered Project under the HUD Act of 1968 and Section 3 Residents and Business Concerns are encouraged to apply - a required Pre-bid Meeting will be held in which Section 3 preferences and compliance will be discussed in detail." If Section 3 documents are not properly signed and submitted with the bid, the bid will be rejected. Work to Be Done: The work to be done shall consist of furnishing all labor, materials, and equipment necessary to construct the project titled CDBG FY2022 Sanitary Sewer System Rehabilitation Improvements - Phase V as shown on the construction drawings. In general, construction consists of an estimated total of 7,897 feet of 8" main sewer rehabilitation improvements proposed (6,410 LF pipe-burst plus 1,487 LF CIPP = 7,897 LF). There is an estimated 2,165 LF of 4" service pipe proposed to replace existing pipe either by pipe-bursting, static pull or open cut installation methods, installation of manholes & cleanouts, manhole rehabilitation (231 VF), erosion control, grassing and all other associated appurtenances necessary for a complete and operational project in the target area.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.