Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

September 11, 2023

December 31, 2023

Multiple Locations

Demolition, New Construction, Paving, Site Work

No Information to Display

$395,722.00

Public - County

img_map_placeholder

Multiple Locations, Springfield, MO

Subscribe to View Full Documents

As of August 21, 2023 this project has not yet been awarded. A timeline for award has not yet been established. The proposed work includes: Work includes removal of existing bridge, construction of a new 55' pre-cast concrete slab beam span bridge, adjacent seal coat roadway construction, installation of rock blanket, installation of fence and erosion control. All bidders must purchase plans through Great River Engineering, Inc. and be on the planholder list in order to bid the project. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Missouri Department of Labor and Industrial Relations (State Wage Rate). The Barry County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2022 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on public works projects shall provide a 10- Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A certified cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The Barry County reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. The DBE Goal for this project is 0%. No 2nd tier subcontracting will be allowed on this project.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects