Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 17, 2023

September 15, 2023

October 7, 2023

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Winfield, AL

Subscribe to View Full Documents

The final day to submit questions will be JULY 14, 2023. The project will consist of the following approximate quantities of work: 7,000 Tons Superpave Bituminous Concrete Wearing Surface Layer, 1/2 " Maximum Aggregate Size ESAL Range A/B, 1000 Tons Superpave Bituminous Concrete Upper Binder Layer, Patching, 1" Maximum Aggregate Size,1000 Tons Superpave Bituminous Concrete Upper Binder Layer, Leveling, 1/2 " Maximum Aggregate Size; all other labor, material, equipment, and work required or implied by the Contract Documents The City will not enter a contract with a non-resident corporation or entity which is not qualified under State law to do business in the State of Alabama. All Bidders shall possess all other licenses and/or permits required by applicable law, rule, or regulation of the performance of the work. Upon submission of proposal, Bidders must submit their Contractor's license number and a copy of said license. Any bid not containing a current license number shall be rejected. Each Bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks shall be made payable to the City of Winfield for an amount not less than 5 percent of the Engineer's estimated cost of the project or of the total bid in the proposal. In no event shall the amount be more than $10,000.00

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects