Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 28, 2023

April 17, 2024

September 13, 2023

408 Chase St

Site Work

No Information to Display

$19,400.00

Public - City

img_map_placeholder

408 Chase St, Florence, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of October 17, 2023, bids were rejected. No definite date for the rebid.** The City of Florence is accepting sealed bids fron qualified and licensed contractors to complete weatherization renovations at 408 Chase Street, Florence, SC. The deadline for the submission of all inquiries is August 21, 2023 at 5:00 pm. SPECIFICATIONS 1. Remove old storm door and install new storm door on front porch. Remove bars off old storm door and install on new storm door. Any trim work needed, caulk, sand and paint around door casing. Adjust storm door entering house to close properly. 2. Remove all lattice around front porch and install with new matching brown lattice. 3. Rescreen all windows that are torn. 4. Repair bottom of storm window on left side of house. 5. Replace kitchen window with single hung vinyl window and any trim work needed inside and out, caulk, sand, and paint to match house. 6. Repair/patch area on back of house around A/C unit and paint to match house. 7. Replace window on back right side of house near back door with new single hung vinyl window any trim work needed inside and out, caulk, sand, and paint to match house. 8. Remove back steps and install/build a wheelchair ramp with handrails approximately 14' long with treated lumber. Paint handrails on ramp to match house. 9. Remove and replace back storm door and any trim needed, caulk, sand, and paint around storm door to match house. 10. Paint back of house, back right side and back left side of house to match existing color of house. Paint fascia and soffits in same area to match existing color of house. 11. Install valve box cover on left side of house. 12. Repair/replace chain link fence double gate.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.