Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

September 12, 2023

No Information to Display

16301 SW 80th Ave

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

16301 SW 80th Ave, Palmetto Bay, FL

Subscribe to View Full Documents

Project Scope Of Entails Miscellaneous Finishes, Lighting and Equipment Replacement, Selective Interior Painting, Selective Toilet/Dressing Rooms Improvements And Electrical Upgrades. Request for Information (RFIs) shall be submitted in writing to hb@legocc.com on or before June 28, 2023 @3:00 PM. LEGO Construction Company is the selected Construction Manager for MDCPS Project SOUTHWOOD MIDDLE SCHOOL which carries SBE/MBE 6.33%, MWB/E (African American, Asian American & Native American firms) - 18.67% & local workforce utilization 20% county wide radius. PREVAILING WAGES: There are NO PREVAILING WAGES applicable for this project. The Work of this Contract comprises the GOB Funded Building No. 1 Renovations at Southwood Middle School located at 16301 S.W. 80 th. Avenue, Palmetto Bay, Florida 33157. Scope of Work includes, but not necessarily limited to the following: 1. Selective Demolition and Removal of Portions of Existing improvements. 2. Replacement/Upgrades to Auditorium sound (audio/visual) system. 3. Replacement/Upgrades to Auditorium Stage lighting system and control panel. 4. Replacement of electrical florescent and "high-hat" Auditorium house lighting. 5. Replacement and/or addition of electrical Auditorium special purpose/courtesy (step) lighting. 6. Replacement / upgrade to Auditorium Epoxy flooring. 7. Replacement / upgrade to Auditorium acoustical wall panels/treatment. 8. Replacement / upgrade to Auditorium Stage curtains and riggings. 9. Replacement / upgrades Dressing Areas and Toilet Room plumbing fixtures, finishes, lighting, ceiling and millwork cabinets. 10. Miscellaneous improvements/upgrades to Auditorium electrical system, wiring and panelboards. 11. Repair and/or Replacement of existing Auditorium Stage flooring. 12. Replacement Of Suspended Acoustical Ceiling Tiles & Aluminum Grid System, Lay-In Light Fixtures, And Miscellaneous Floor Finishes. 13. Incidental Interior Painting 14. Incidental Cutting, Patching and Repair Work. 15. Other miscellaneous incidental work as indicated in the Contract Documents. The General Scope of Work Involves the GOB Funded Renovation Of An Existing Public Educational Facility, Specifically "Southwood" Middle School Building 01 Auditorium Renovations; Project Scope Of Entails Miscellaneous Finishes, Lighting and Equipment Replacement, Selective Interior Painting, Selective Toilet/Dressing Rooms Improvements And Electrical Upgrades which includes, but not necessary limited to, the following: 1. Acoustical Ceiling Tile and Grid Replacement. 2. Replacement / Upgrade To Existing Auditorium Aisles V.C.T. Flooring (DA-1) 3. Repair/Renovation of Auditorium Stage Flooring (DA-2). 4. Replacement / Upgrade to Auditorium Sound System & Control Panel. 5. Replacement / Upgrade to Auditorium Stage Lighting and Control Panels. 6. Replacement of Florescent and Hi-Hat Auditorium House Lighting. 7. Addition of Auditorium New Special Purpose / Courtesy (Step) Lighting. 8. Incidental Auditorium Interior Painting, Cutting And Patching of Surfaces Work. 9. Miscellaneous Replacement / Upgrade to Auditorium Electrical System, Panelboards and Wiring. 10. Replacement / Upgrade to Auditorium Acoustical Wall Panels / Treatment (DA-4). 11. Replacement / Upgrade to Auditorium Stage Curtains and Riggings. 12. Replacement / Upgrade to Auditorium Epoxy Flooring (DA-3). 13. Dressing Areas and Toilet Room Finishes, Lighting, Exhaust Fan Grilles & Millwork Replacement / Upgrades (DA-5)

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.