Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

August 14, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Phenix City, AL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The contractor shall remove from service, prepare for pickup, and ship, the previous pump for ultimate disposal. b. Replacement to include (1x) 54" diameter Open Flight Screw Pump bearing-to bearing replacement of existing 54" OFSP. (Existing drive assembly to be reused) The pump has a capacity of 5,379 gpm at approximately 20.9ft of lift and 38-degree angle on incline, including: 1. 30" diameter torque tube 2. Three (3) flights 3. Combination radial & thrust lower bearing 4. Gravity oil lubricated 5. Deflector plates 6. Upper bearing 7. Upper stub shaft 8. Low-speed coupling 9. Painted Finish c. Installation to include: i. Unloading of all equipment including coordination with plant personnel ii. All necessary lifting and transportation of any equipment iii. Any applicable bypass pumping iv. Concrete structure modifications where applicable v. Removal of grout and re-grouting of the trough 1. Minimum grout thickness to be 3/4 of an inch 2. Grout thickness 1/4 of an inch from flight edges vi. Installation of flow deflectors vii. Equipment start-up and any applicable training d. Technical literature to include: i. Preventative maintenance schedule

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects