Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 27, 2023

August 28, 2023

October 27, 2023

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

Multiple Locations, Gulfport, MS

Subscribe to View Full Documents

As of Aug 4, 2023 the project has not yet been awarded. A timeline for award has not yet been established . The work consists of, but is not limited to: Furnish all materials, equipment, labor, and supervision and performing all operations necessary for the completion of Mississippi State Port Authority "Hurricane Zeta Timber Piers Repair" project at Gulfport, Mississippi as described in the contract documents. The Contractor shall provide and furnish all tools, equipment, materials, supervision, labor, subsistence, rental, subcontractors, permitting, profit, overhead, appropriate taxes and any other related costs. The Contractor shall provide all materials required, except those specifically indicated as being Owner Furnished by Mississippi State Port Authority at Gulfport. The work includes all that is necessary to provide the Owner with a complete project. Generally, the project includes: Repairs to the North and South timber piers in the commercial harbor and the tugboat pier in the North harbor. Should it appear that the Work to be done, or any matter relative thereto, is not sufficiently detailed or explained in the Contract Documents, the Contractor shall apply in writing to the Engineer for such further explanations as may be necessary for Contractor to accomplish the Work of Improvement, and Contractor shall conform to such explanation or interpretation of the contract by Engineer so far as may be consistent with the intent of the original Plans and Specifications. In the event of doubt or question relative to the true meaning of the Specifications or Plans as explained or interpreted by the Engineer, reference shall be made to the Authority, whose decision thereof shall be final. In the event of any discrepancy between any Plans or Drawing and the figures written thereon, the figures shall be taken as correct. Each Bid must be accompanied by cash, a cashier's check, certified check or Bid Bond in the amount of ten percent (10%) of the total Bid amount. The power of attorney for the bonding company's agent should be on file with the Mississippi State Port Authority or should accompany the Bid, and the Bid Bond must be furnished by a corporate surety company qualified to do business in Mississippi. The Bid Bond shall name the Mississippi State Port Authority as the obligee, shall be substantially in the form of the Bidder's Bond on file with the Mississippi State Port Authority, and shall be payable to the Mississippi State Port Authority in the event the Bidder fails to execute, and deliver to the Mississippi State Port Authority the Contract within fourteen (14) days after the award of the Contract to Bidder Bidder must provide with Bid the name, location and the place of business of each subcontractor who will perform work or labor or render services to the Contractor in or about the construction of the Work of Improvement, or who will specially fabricate and install any portion ofthe Work according to detailed Drawings contained in the Plans and Specifications, in an amount in excess offive percent ofContractor's total Bid. Bidder must provide with Bid the Certification Regarding Debarment, suspension, other responsibility matters and lobbying. Bidder must provide with Bid the portion of the Work which will be done by each subcontractor. Contractor shall list only one subcontractor for each such portion as is defined by Contractor in the Bid. Bidder must provide with Bid a copy of each Subcontractor's Mississippi State certificate ofresponsibility, if Subcontractor is required by law to have one. Bidder must provide with Bid a copy of Contractor's Mississippi State certificate of responsibility. Bidder must provide with Bid a certification letter stating that all new labor hires will be residents of Mississippi. Bidder must provide with Bid a certification letter stating that Bidder will agree to use Mississippi products over non-Mississippi products when all things are equal with respect to price, quality, availability and service. Bidder must provide a Bid Bond with Bid. If Bidder is a non-resident contractor, Bidder must provide with Bid a copy of contractor's current State law pertaining to own State's treatment of non-resident contractors.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.