Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

October 2, 2023

March 25, 2025

1545 Josh Pirkle Rd

Addition, Demolition, Renovation, Site Work

No Information to Display

$25,000,000.00

Public - City

img_map_placeholder

1545 Josh Pirkle Rd, Braselton, GA

Subscribe to View Full Documents

Project bidding to prequalified bidders is to be determined as of 8/18/23 CMAR services are to be provided under a single contract with two parts to the work. Part 1 will include utility relocation and intermediate grading and surcharging of the site. Part 2 will include construction of the remaining components of the plant expansion project. Fees will be established in four separate actions. Part 1A - Design, Part 1B - Construction, Part 2A - Design and Part 2B - Construction in connection with the project. The CMAR Contract will include preconstruction services, subcontractor procurement, and construction services. The Project consists of, but is not limited to the following major elements: Part 1 - Site preparation and earthwork required to grade the pad for the site, earthwork and grading required to surcharge the Phase 1 3.5 MGD oxidation ditch and clarifier area, and relocation of existing drainage, force mains, water lines and power utilities. Part 2 - Site preparation and earthwork required to remove the surcharge material from Part 1 and relocate it to the future Phase 2 7.0 MGD oxidation ditch and clarifier area, construction of Phase 1 3.5 MGD oxidation ditch, two 80 ft diameter clarifiers, RAS/WAS pumps and building, one 78 ft diameter digester, reuse pump station improvements, UV disinfection, new belt press and building, conversion of existing SBR basins to digesters, demolition of existing steel tank digester and SBR's, associated piping, electrical and miscellaneous appurtenances. Successful Proposer will be required to perform WORK as the Prime Contractor. WORK performed by Prime Contractor shall be at a minimum 30% of the contract value. Questions regarding this RFQ shall be received no later than 5:00 p.m. on July 26, 2023

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects