Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2023

October 19, 2023

February 15, 2024

10800 Sam Clark Ln

Renovation, Site Work

No Information to Display

$152,898.00

Public - County

img_map_placeholder

10800 Sam Clark Ln, Kansas City, KS

Subscribe to View Full Documents

Site Directions: The site of the project is located at 10800 Sam Clark Lane, Kansas City, KS 66109. Est. Completion Date: Feb. 15, 2024 The work includes electrical and instrumentation improvements to the membrane filtration system at the Wolcott Water Treatment Plant. In particular, the work includes replacement of the existing solenoid banks, replacement of the existing microfiltration system master PLC processor modules and redundancy modules, replacement of the existing microfiltration train control panel controllers with ethernet adapter modules, replacement of the existing control network with a device level ring network topology, new conduit as necessary to establish the new control network, replacement of the existing membrane filtration junction boxes and re-routing of the existing conductors, removal of the existing microfiltration control panel OITs and patching/repainting the panels, removal of the existing microfiltration control panel UPS units, programming updates for the microfiltration system PLC, supporting the Owner's SCADA Integrator with integration of the membrane filtration system into the Owner's SCADA system, testing, startup services, and all other work as indicted on the drawings and specifications. The Owner, through a Purchase Requisition with Pall Water (Membrane Filtration System Supplier) shall furnish the Contractor with the control system hardware and perform the services as identified in the Contract Documents.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.