Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2023

October 1, 2024

November 30, 2025

Multiple Locations

New Construction, Site Work

No Information to Display

$38,400,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Minneapolis, MN

Subscribe to View Full Documents

Construction Manager Services for a new Advanced Operations Center, located on the east bank of the Twin Cities campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. The Board of Regents of the University of Minnesota (the University) is requesting Proposals to provide construction manager services for a new Advanced Operations Center, located on the east bank of the Twin Cities campus (the Project). The proposed Advanced Operations Center (AOC) will include a two (2) story 33,000 sq ft University mission critical Tier III (alike) facility that will relocate the network operations center function from 2218 University Avenue along with the data center functions for the West Bank Office Building (WBOB). The University conducted a Predesign in 2022-2023 which analyzed the baseline project objectives for this facility along with studying utility/ fiber routing and site selection. The new facility will be sited at the north end of Lot C33 located on the East Bank Campus (northwest of Huntington Bank Stadium). The Project is located within an active part of the campus and adjacent to sensitive research facilities where vibration and noise can be a concern. CMaR to consider and develop construction methods to mitigate noise and vibration. CMaR will facilitate vibration monitoring that aligns with research criteria requirements. In addition, the Project abuts non-University owned property which includes Rail Road and the City of Minneapolis. The CMaR will be required to work closely with Planning, Space, and Real Estate (PSRE) to ensure proper protocols/ jurisdictional requirements are followed. The University has established a construction budget for the Cost of the Work in the amount of $38,400,000 (current dollars, no escalation). The University requires the Project to be substantially complete by no later than November 28, 2025. Deadline for RFP Questions July 6, 2023 at Noon Space Usage/Program attachedYes No Brief Description of Project: Relocate the existing Network Operation Center (NOC) from 2218 University Ave along with the Data service functions located in the Basement of WBOB to a new free standing facility located in the BDD District of the East Bank Campus. Relocation is required to accommodate future 3rd party land development and long-range campus planning. Key Program Objectives and Measures for Success: Design a free standing network/ data center that can meet the University

35 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects