Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

September 4, 2023

September 3, 2027

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, El Centro, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Type of Award: Lump Sum License Requirements:Class A or C-32 The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Standard Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of painting traffic stripes (traffic lines) and pavement markings, applying glass beads, and furnishing and placing raised pavement markers in conformity with plans and specifications set forth in the Contract Documents, including furnishing all material, labor, paint, tools, equipment, and services necessary for and incidental to completion of the project. Online Q&A: Yes Q&A Deadline:06/30/2023 5:00 PM (PDT) When working in roadways, the Contractor is expected to control the movement of equipment, personnel, and supplies between vehicles and the median and traffic islands. The Contractor shall implement all approved methods of lane closure and traffic control so as not to create any safety hazard or obstruction of vehicular traffic on the roadway. Required warning devices shall be used to warn approaching motorists of workers and equipment working in the travel lanes. All workers operating in the public-right-of-way shall wear all required safety personal protective equipment (PPE) and safety vests. The scope of work is more specifically described on the construction plans and in these Specifications. The term of this agreement shall be from the Effective Date through four (4) years. May upon mutual agreement extend the contract for one (1) additional two (2) year term. Liquidated Damages: If contractor receives three (3) written warnings within a six-month period, the City will assess $10,000. in liquidated damages.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects