Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 11, 2023

August 1, 2023

September 30, 2023

296 S 1400 E

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

296 S 1400 E, Jerome, ID

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This solicitation is being issued as a Request for Quotations. Substitute the words "quote" and "Quoter" for "offer" and "Offeror" where they appear on this form. The acceptance of a quote by NPS will not establish a binding contract. Request for Quotations #140P8323Q0029 is for the replacement of cable line with fiber optics. The Contractor shall provide all installation and management labor, transportation, insurance, administrative and other services to complete the proposed project. PROJECT LOCATION:Minidoka National Historic Site, 296 South 1400 East, Jerome, ID. 83338. Information about this site is at https://www.nps.gov/miin Notes: a) The North American Industrial Classification System (NAICS) code and the associated small business size standard are noted in provision 52.204-8 in Section K of this solicitation. b) This procurement is 100% set-aside for small business concerns in accordance with FAR Part 19.5. c) In accordance with FAR 36.204, the estimated magnitude of this constructionproject is between $100,000 and $250,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Goals for Minority Participation for Each Trade: 4.0% Goals for Female Participation for Each Trade: 6.9% All tasks and deliverables for this contract must be completed within 90 days after Notice to proceed. Days listed herein refer to calendar days. The project cannot be performed from July 1stto the 15th due to park ceremony. The project consists of running 24 strand Single Mode Fiber Optic Cable through conduit from the Herrmann House (Administration) to the Visitor Center terminating into the wire room. Another 24 strand Single Mode Fiber Optic Cable through conduit from the Herrmann House (administration) to the Robeson House (maintenance) terminating into the building (approximately 4000ft). The new 24 Fiber Optic Cable will be run in one UD(1X2-1) conduits (approximately 3200ft).

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects