Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 6, 2026

September 18, 2023

No Information to Display

90 West Ave

Renovation

No Information to Display

$54,788.00

Public - City

img_map_placeholder

90 West Ave, Woodstown, NJ

Subscribe to View Full Documents

Furnish and install a slide gate on the downstream side of the influent pipe of the influent pump station wet well at the wastewater treatment plant. Temporary bypass operations are required for completion of the Contract work. The existing 14-inch ductile iron influent pipe is to be trimmed to accommodate the new slide gate and the existing ladder within the wet well is to be removed and properly disposed of. The existing wet well is to be cleaned; waste within the existing wet well is to be removed and properly disposed of. The slide gate shall be installed in a true vertical plane, square and plumb, with no twist, convergence, or divergence between the vertical legs ofthe guide frame. The Contractor shall fill any void between the guide frame and the structure with nonshrink grout. A Pre-Bid conference has not been scheduled for this project. Bidders questions are requested by June 19,2023. Bids must be accompanied by a Certificate of Surety from an acceptable surety and a bid security in the form of a certified check, cashier's check or bid bond payable to the Woodstown Sewerage Authority in the amount of ten percent (10%) of the total bid amount but not in excess of $20,000.00. The overall project includes furnishing and installing a retrofitted safety grate as well as a slide gate to control sewage flow at the influent pump station of the wastewater treatment plant. During the work, the Contractor will be required to bypass pump around the influent pump station pumps. The Owner reserves the right to reject any and all bids in whole or in part, and to waive any informalities or minor defects therein, should it be deemed in the best interest of the Owner, in accordance with Local Public Contracts Law and will determine the lowest responsible and responsive bidder in compliance with N.J.S.A. 40A:11-24. The successful bidder must furnish a Performance Bond and Payment Bond, each in the amount equal to one hundred percent (100%) of the contract price. A Pre-Bid conference has not been scheduled for this project.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.