Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

August 13, 2023

December 31, 2024

889 Kinglet Ct

Site Work

No Information to Display

$1,986,195.00

Public - City

img_map_placeholder

889 Kinglet Ct, Brighton, CO

Subscribe to View Full Documents

Reference Number 0000322277 Question Acceptance Deadline 06/22/2023 11:00 AM EDT Description The City seeks the bid of qualified respondents to provide services that shall rehabilitate the pump station and water line located near Ken Mitchell Park. The City owns a non-operational pump station in this area and expect that at the completion of this project it shall be used to pump raw water to the east end of the City in order to meet water use obligations. The Respondent shall be responsible for furnishing all labor, materials, supplies, tools/equipment, and all other things necessary for completion of the project in compliance with the civil construction plans and specifications General Requirements - Certification/Training - Contractors License Required - FOB Destination - Installation Required - Insurance Required - License Required - Warranty Information Required - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Procurement Point of Contact: Kelsey Archuleta Email Address: procurement@brightonco.gov The project shall include furnishing all labor, materials, and equipment for the supply, delivery, fabrication, installation, testing, and other materials and services required for the Ken Mitchell to Beebe Draw Pump House Rehabilitation project. Salient features include, but are not limited to: 1. Demolish pumping skid, pumps, piping, electrical control panels, and concrete floor from existing building. 2. Install helical piles to provide additional support for existing grade beams. 3. Cast new concrete floor over wet well to accommodate new pumps. 4. Install new pumps, piping, and surge tank in building. 5. Install new electrical panels, control panel, and instrumentation. 6. Install new lights. 7. Block in existing louver with new masonry block. 8. Install new HVAC system. 9. Insulate building and paint interior of building. 10. Install gutters and downspouts. 11.Patch concrete slab exterior of building where slab was demolished. 12.Install two (2) new air vac vaults in pump-back line. 13.Install one (1) new pressure sustaining vault in pump-back line. 14.Install a flow meter at the augmentation pipe outfall. 15.Rehabilitation/repair of existing eastern outfall structure if necessary (will require coordination with FRICO) 16.Any other work identified in the provided plans and specifications 17.Contractor will be responsible for coordinating with City of Brighton staff during all phases of the project. 18.Obtain all necessary permits required for construction of the project

45 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects