Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 1, 2024

No Information to Display

245 Smith St

Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

245 Smith St, Winnipeg, MB

Our team is requesting plans for this project.

Subscribe to View Full Documents

Winnipeg Police Services HQ Evidence Control Unit Structural Upgrades, located on the P1 level to accommodate a new high-density racking system. Total floor area approximately 10,500 square feet. Assess the existing structural floor slab and steel framing in order to determine a safe maximum pallet weight for the new high-density racking system. It is assumed that the capacity of the floor can be enhanced with the placement of a bonded topping. A preliminary high-density racking system layout that accommodates approximately 1200 pallets is available. The new racking system requires a flat level floor. Eliminate existing floor slopes and existing floor drains by removing and replacing the concrete topping over the existing structural slab. Approximately 1,500 square feet of the concrete topping has de-bonded from the structural slab. A raised floor area of approximately 3,100 square feet is to be removed as shown on drawings. Modify the existing double interlock pre-action fire-protection system to accommodate the high-density racking system. This could possibly include in-rack sprinklers. Modify the existing HVAC system to accommodate the high-density racking system. This will likely mean re-routing of the ducts in ECU to run north-south down the fork-lift aisle. Any and all other Building Code related items (Life Safety, Electrical, etc.) to be addressed as part of this design. Supply and installation of a Radio Shuttle high-density racking system to accommodate up to 1200 pallets. TIMELINE: An RFP for design has been issued by the owner. RFP date has been extended. Updates will be made upon award of contract. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.