Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 7, 2023

October 25, 2023

October 27, 2023

Bloomfield St

Paving, Site Work

No Information to Display

$190,213.00

Public - City

img_map_placeholder

Bloomfield St, Los Alamitos, CA

Subscribe to View Full Documents

The City of Los Alamitos proposes to cold mill and construct ARHM overlay, reconstruct failing asphalt, reconstruct damaged curb ramps, and construct new curb ramps on Bloomfield Street from Katella Avenue to Florista Street. In addition, the project will also include adjustment of existing utility surface facilities to grade and signing and striping. Existing private facilities will be protected in place within the limits of the project unless otherwise shown. The bid must be accompanied by a bid guarantee in the amount of 10% of the total bid by 11:00 a.m. ON THE DATE ADVERTISED FOR THE OPENING OF BIDS. More specifically, pursuant to Public Contract Code 20170 and 20171, all bids for the project shall be presented, under sealed cover and shall be accompanied by one of the following forms of bidder's security in the amount of ten percent (10%) of the bid: (a) cash; (b) a cashier's check made payable to the City of Los Alamitos; (c) a certified check made payable to the City of Los Alamitos; or (d) a bidder's bond executed by an admitted surety insurer made payable to the City of Los Alamitos. Such security shall be forfeited should the successful bidder to whom the contract is awarded fails to timely execute the contract and to deliver the necessary bonds and insurance certificates as specified in the contract documents. To the extent applicable, at any time during the term of the Agreement for the proposed project, the successful bidder may, at its own expense, substitute securities equivalent to the amount withheld as retention (or the retained percentage) in accordance with Public Contract Code 22300. Pursuant to California Civil Code 3247, a payment bond is required to be submitted for all projects estimated in excess of $25,000.00. If this proposal is accepted, we agree to sign the contract form and to furnish the Performance Bond and the Payment Bond (each to be 100% of the bid amount), the Maintenance Bond (to be 50% of the bid amount), and the required evidences of insurance within ten (10) calendar days after receiving written Notice of Award of Contract. The Question deadline on Wednesday, August 9, 2023 at 5:30pm If you have any questions, please contact City Engineer Chris Kelley at (562) 357-5411. Contractors are required by law to be licensed and regulated by the contractors' state license board. Any questions concerning a contractor may be referred to the registrar, contractors' state license board, p.O. Box 2600, sacramento, ca 95826. At the time the contract is awarded, the contractor shall be properly licensed in accordance with the laws of this state. The first payment for work or material shall not be made unless and until the Registrar of Contractors verifies to the Agency that the records of the Contractors' State License Board indicate that the contractor was properly licensed at the time the contract was awarded. Any bidder or contractor not so licensed shall be subject to all legal penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractors' State Board. Failure of the bidder to obtain proper and adequate licensing for an award of a contract shall constitute a failure to execute the contract and shall result in the forfeiture of the security of the bidder. (Public Contract Code 20103.5) The DBE contract goal for this project is 18%. Pursuant to California Labor Code Sections 1770, 1773, 1773.1, 1773.6, and 1773.7, as amended, the applicable prevailing wages for this project have been determined. It shall be mandatory upon the contractor to whom the contract is awarded and upon any subcontractor under him to pay not less than the higher of the Federal and the State prevailing wage rates to all workers employed by them in the execution of the contract. The Contractor shall begin work within fifteen (15) calendar days after the date of the Notice to Proceed, and shall diligently prosecute said work to completion before the expiration 20 WORKING DAYS. The Contractor shall pay to the Agency the sum of $1,500.00 per day, for each and every calendar day's delay in finishing the work in excess of the number of working days prescribed above. The Agency reserves the right to reject any and all bids.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects