Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2023

August 1, 2023

June 30, 2024

42nd St SW & S Garfield Ave

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

42nd St SW & S Garfield Ave, Campion, CO

Subscribe to View Full Documents

Reference Number : 0000322172 Question Acceptance Deadline : 06/22/2023 02:00 PM EDT Questions are submitted online : Yes Prebid Conference : 06/14/2023 03:30 PM EDT Contact Information Jacob Hebert 970-344-6374 jhebert@ltwd.org Brad Eaton 970-344-6373 beaton@ltwd.org Description The Work to be performed under this Project generally includes: The supply and installation of approximately 5,089 lineal feet of 8-inch PVC C900 DR 14 waterline, 3,242 lineal feet of 6-inch PVC C900 DR 14 waterline, and appurtenances along S. Garfield Avenue, Hankins Lane, Willow Circle Drive, and Page Place, to complete replacement of the existing 8-inch CIP, 6-inch CIP, and 4-inch CIP waterlines. The supply and installation of new meter pits and service lines that will replace existing meter pits that are currently connected to the existing waterlines that will be replaced. Proper abandonment in place of the existing 8-inch, 6-inch, and 4-inch CIP waterlines. All other labor, materials, supervision, traffic control, restoration and revegetation, materials testing, equipment, tools, pipe bedding material, concrete for thrust blocking, and all other additional items including permits necessary to complete the Work in substantial conformity with the Plans and Specifications. General Requirements - Contractors License Required - Installation Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 %

58 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.