Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

February 19, 2024

No Information to Display

30875 Rancho Vista Rd

Site Work

No Information to Display

$1,613,875.00

Public - City

img_map_placeholder

30875 Rancho Vista Rd, Temecula, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Scope of Services for the Project includes all disciplines necessary to completely design and construct the Project, including, without limitation, all on-site and off-site work. The services sought for this Project include all customary services normally provided under the umbrella of the design-build method of project delivery. This includes, but is not limited to, full design services, agency approvals, site survey, geotechnical investigation, construction, procurement, scheduling, estimating, value engineering, general contracting, permitting, utility coordination and construction, building commissioning, project closeout, and warranty services. This project is prevailing wage. The DBE's duty to pay State prevailing wages include requirements per Labor Code Section 1770 et seq. Labor Code Sections 1775 and 1777.7 outline the penalties for failure to pay prevailing wages and employ apprentices, including forfeitures and debarment. The City reserves the right, to modify this RFQ, to change, by additions, deletions or modifications, the Project Criteria, Project Budget, or any other portion of the RFQ Documents prior to submittal date. If the DBE is awarded a contract for this Project, the DBE, individually or as a team, agrees to obtain a Payment Bond in an amount equal to one hundred percent (100%) of the contract amount, excluding preconstruction services, design services and errors and omission insurance for all design services, and a Performance Bond in an amount equal to one hundred percent (100%) of the contract amount, excluding preconstruction services, design services and errors and omission insurance for all design services. These bonds shall utilize a form that complies with the forms which will be issued with the RFP and shall be secured from a surety company or companies satisfactory to the City within ten (10) calendar days of the contract award. The Payment Bond shall remain in full force and effect for as long as required by applicable law. The Performance Bond shall remain in full force and effect for as long as the DBE has obligations under the contract documents. The Bonds must comply with all conditions regarding bonds detailed in the Design-Build Contract and the Design-Build General Conditions. The cost of the bonds shall be deemed included in the Proposers costs. Question Deadline 10/11/2023 at 5:00 PM PT. Confirmed Shortlist.

72 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.