Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 28, 2023

February 27, 2024

No Information to Display

8653 Calaveras Rd

Renovation

No Information to Display

$183,000,000.00

Public - County

img_map_placeholder

8653 Calaveras Rd, Sunol, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project Description ****SFPUC Upcoming Contracting Opportunity**** The San Francisco Public Utilities Commission (SFPUC) will advertise a construction contract, WD-2897 Sunol Valley Water Treatment Plant Ozonation. The SFPUC is actively working on the advertisement and has set a goal to advertise by mid-July 2023, possibly sooner. Project Description The scope of this project is to install a raw water ozonation system including the following major components: 10-inch through 66-inch diameter piping, elbows and valves; Concrete valve vaults; Ozone Generator Building; Electrical Building; Loop Cooling Water Systems; Cryogenic Oxygen Tank Systems; Liquid Oxygen Vaporizer Systems; Ozone Generators; Ozone Injector Systems; Ozone Contact Basin; Ozone Destruct Systems; Pre-chlorination Facilities for Bromate Control Instrumentation & Controls; Shop Space; Solar Panels; Standby Power Systems; High Voltage & Low Voltage Electrical Eq. & Distribution Systems; Underground Utilities; and Site Improvements. Engineer's Estimate is $183M Important Dates Substantial Completion - 1,522 calendar days from NTP Final Completion - 90 calendar days after Substantial Completion

48 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects