Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 29, 2023

July 31, 2023

November 28, 2023

559 S Section St

Remodeling, Renovation

No Information to Display

$164,200.00

Public - City

img_map_placeholder

559 S Section St, Fairhope, AL

Subscribe to View Full Documents

Question Deadline 06/15/2023 at 2:00 PM CT Bids shall be accompanied by a Bid Security equal to 5% (percent) of the bid price, but in no event more than $10,000.00. Bid Security shall be in the form of a Bid Bond or a cashier s check payable to The City of Fairhope. The BIDDER agrees to repair and remodel the front façade and interior space of the City s Haven Animal Shelter, in 120 calendar days allowed for work, no exceptions for holidays, following a 15-day Notice to Proceed Period. SCOPE OF WORK: Work shall include, but not be limited to the following: o Demolition and disposal of front facade (storefront) wall and EIFS stucco as noted in the plans o Demolition and disposal of walls, sheathing, paneling, doors, frames flooring, tiles, fixtures, lighting, registers, ceiling and all other debris generated by the demolition phase in the front space of the building and as noted in the plan o Wood frame construction of load bearing walls at building facade o Extension of the roof end gable creating a full-width 6-foot porch along the storefront - with required supporting posts and bracing o Roof decking with code-compliant underlayment and new shingle matching and tied back into existing asphalt shingle roof o Installation of storefront egress doors and windows o Exterior siding - Hardie(R) Panel Vertical Siding - with battens with brick veneer wainscoting on front facade o Installation of, taping, mudding and sanding of sheetrock walls o Installation of a gridded drop ceiling o Exterior and Interior Painting o Installation and replacement of LED light units and HVAC returns and diffusers into ceiling system o Installation of LVT floor system with shoe molding o Electrical - maintenance of and replacement of all existing switches and receptacles, establishment of new subpanels, placement and wiring of new additional receptacles, wiring of ceiling lights and other code compliant electrical work o IT - Placing two drops per room o Plumbing - maintenance of and replacement of all existing water and drain lines, water heater, ADA water fountain, faucets, service sink, counter sinks and bathrooms - combination of rehabbing/tying to existing and new o Mechanical - maintenance of and replacement of all existing returns, registers and diffusers within ceiling and walls o Contractor shall permit all work through the City Building Department o All material purchased shall be tax exempt and the Contractor shall be required to file all required documents o All other incidental work, as a subsidiary obligation of the lumps sum bid, necessary to deliver a "Turnkey" project.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.