Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

September 25, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

$62,000.00

Public - County

img_map_placeholder

To Be Determined, Saint Charles, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Historic Courthouse Rotunda Decorative Painting Re-Bid Scope of Work: The County will contract with an artist to design and implement decorative trim and murals that will be painted on the walls only on the third floor the building that starts at the top of the grand staircase, framed by plaster columns on each side, leading up to the Council Chambers. We have three identifiable areas to adorn the third floor as detailed below. The scope of the project will include working with designated County staff to determine the images to be painted in each of the outlined murals, how these images will be depicted and once approved, will implement the approved painting on the appropriate sections. The final negotiated price will be based upon the time needed to obtain the agreed upon design. The County is responsible for any plaster repair work that is needed prior to the start of the decorative painting. The overall painting of the walls is not included in the overall base cost, but the base paint color will be a mutually agreed upon color to coordinate with the murals. The County expects the area being painted to be cleaned and accessible each day to ensure the public and staff having access to the areas. All trash shall be properly disposed of by the contractor. Any damage to existing flooring, structure, or furnishings by the contractor, shall be restored by the contractor. All questions must be received no later than 2:00 PM on 8/16/23. Any question received after this deadline may not be answered. Performance and Payment Bonds: A 100% Performance and Payment Bond in favor of the Owner. The Security Co. representing Contractor must be authorized to do business in the State of Missouri and be approved by Owner. Performance and Payment bond will be required if project is $50,000.00 or greater.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects