Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

October 9, 2023

October 8, 2024

RANGE 27E, TOWNSHIP 30S

Site Work

No Information to Display

$4,418,550.00

Public - County

img_map_placeholder

RANGE 27E, TOWNSHIP 30S, Babson Park, FL

Subscribe to View Full Documents

ORACLE PROJECT # 42011.680536034.5666000.6827000 PCU PROJECT # 2021-8-60-0 Furnish all labor, materials, supervision, and equipment necessary to perform all operations required for the construction of three new duplex lift stations - LS-374, LS-375, and LS-376 - to replace list stations with the same designation and to construct a new force main to transmit flow from LS-374 approximately 1,750 feet west along Sunshine Drive to the west side of US Highway 27 and approximately 5,000 feet north on US Highway 27 and manifold into an existing City of Lake Wales force main Qualification Requirements: Bidder shall be a State of Florida licensed General Contractor with experience in lift station and underground construction of similar nature. HDD Installers must have a minimum of five (5) years of experience as the prime bidder with the specific product and have installed a minimum of 50,000 LF of pipe by HDD as the prime bidder. QUESTIONS: Submit all questions to Ari Goldstein, Senior Procurement Analyst, via email at arigoldstein@polk-county.net or via fax at (863) 534-6789 by 4:00 p.m. Friday, July 28, 2023. The project is located within the Crooked Lake subdivision and along US Highway 27. Lift station LS-374 replacement is at the corner of Sunshine Drive and Canal Drive, LS375 Replacement is along Canal Court, and LS-376 replacement is at the package wastewater treatment plant along East Lane. New 6-inch force main is being installed along Sunshine Drive out to US Highway 27. New 8-inch force main is being installed along the west side of US Highway 27 from Sunshine Drive north to approximately 500 feet south of the Alturas Babson Park Cut Off Road (CR 640) right-of-way.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects