Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2023

July 31, 2023

June 30, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$2,095,010.00

Public - City

img_map_placeholder

Multiple Locations, Port St Joe, FL

Subscribe to View Full Documents

This project consists of the construction of a new low pressure sewer system ranging in size between 2- inch and 6-inch in diameter to serve the Beacon Hill community in Port St. Joe, FL. The low-pressure sewer system will ultimately discharge to the Beacon Hill Master Lift Station, currently under construction. The approximately length of 2-inch to 6-inch pipes are as follows: 11,900 LF of 2 ; 3,960 LF of 3 ; 1,520 LF of 4 ; and 2,260 LF of 6 . The approximately length described above is provided to contractors for information only. Contractor shall be responsible for estimating the total length of pipe per diameter as shown on the plans. In addition, contractor shall furnish and install all fittings, isolation valves, cleanouts, pressure sewer service lines to each property (developed or not) per detail PS-4 on sheet D4 of the plans, and all other appurtenances for a complete system including pressure testing. Contractor shall be responsible for field coordination with property owner the location of each pressure sewer service line. Work shall also include all surface restoration and asphalt/concrete paving cut and replacement to match existing as described on the plans. The completion date for this project will be 300 days for Substantial Completion and 335 days for Final Completion from the date of the Notice to Proceed presented to the successful bidder. Liquidated damages for failure to complete the project on the specified date will be set at $500.00 per day Please indicate on the envelope that this is a sealed bid, for the BEACON HILL LOW PRESSURE SEWER SYSTEM. The City of Port St. Joe reserves the right to waive informalities in any bid, to accept and/or reject any or all bids, and to accept the bid that in their judgment will be in their best interest. All bids shall remain firm for a period of sixty days after the opening All bidders shall comply with all applicable State and local laws concerning licensing registration and regulation of contractors doing business to the State of Florida. All technical questions must be addressed in writing and emailed to Jose Pereira at jpereira@dewberry.com no later than June 16, 2023.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects