Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 14, 2023

September 11, 2023

September 10, 2026

To Be Determined

Site Work

No Information to Display

$13,000,000.00

Public - City

img_map_placeholder

To Be Determined, Anderson, TX

Subscribe to View Full Documents

As of 9/7/2023, this project has not yet been awarded. Award details will be made available following September SAWS Board meeting. Sealed proposals are requested by the San Antonio Water System for the demolition of the existing 5-MGwelded steel ground storage tank and construction of a new 5-MG pre-stressed concrete ground storage tank, improvements to the existing triple control valve assembly, replacement of the existing electrical switchgear, painting and coating of the existing pumps, hydro- pneumatic tank, valves, and piping, replacement of the existing fencing, gate and security systems, electrical and instrumentation and controls improvements, site grading and drainage improvements, and other improvements necessary to complete the project as included in the Contract Documents for the Bitters Pump Station Upgrades and Tank Replacement Project. For questions regarding this solicitation, technical questions or additional information, please contact Stella Manzello, Contract Administrator, in writing via email at Stella.Manzello@saws.org or by fax to (210) 233-4290. until 4:00 PM (CDT) on June 21, 2023. Answers to the questions will be posted to the web site by 4:00 PM (CDT) on June 30, 2023, as a separate document or included as part of an addendum. Please be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or City of San Antonio officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond). Construction duration is 1,095 calendar days.

106 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.