Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 31, 2023

August 30, 2023

September 29, 2023

10451 SW 49th Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

10451 SW 49th Ave, Ocala, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

LAST DAY FOR QUESTIONS: June 7, 2023, 12:00 PM For questions relating to this solicitation, contact: Anette Francia | anette.francia@marionfl.org The Office of the County Engineer is seeking quotes for the demolition of one (1) structure. Demolition and removal, per the scope of work. This includes materials, equipment, labor, and all costs associated with the work. No additional fees will be allowed. Property Site Inspections: It is recommended that the Contractor visit and inspect the property before submitting a Quote. 2. Contractor must remove all of the structure using a wet demo method, remove the underbrush, and rough grade the site upon completion. 3. Contractor must cap and abandon wells following the state regulations on proper well abandonment; permanently abandon, remove the septic tank(s), and fill with clean sand or suitable material and rough grade upon completion. 4. Removal includes slab(s), driveway(s), all junk, litter, and unserviceable vehicles when applicable. The driveway(s) connection to the public right of way shall be left intact to protect the edge of the asphalt. Typically, a minimum of at least one section of a concrete driveways and/or at a minimum of 10 from edge of pavement. This will be determined at the pre-con meeting. Contractor shall have exclusive salvage rights. Any towing fees/expenses (cost of removal, transportation, storage, incidental damages, etc.) associated with the removal of any unserviceable vehicle(s) shall not be the financial responsibility of the County. In accordance with Florida Statutes (713.78), fees/expenses associated with the removal of any unserviceable vehicle(s) may be billed directly to the registered owner of the vehicle(s)

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects