Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 29, 2023

February 22, 2024

No Information to Display

210 Pickens St

Renovation

No Information to Display

$345,000.00

Public - County

img_map_placeholder

210 Pickens St, Marion, AL

Subscribe to View Full Documents

As of August 22,2023, project was not awarded. No definite date for the rebid. Principal items of work include roof demolition and replacement including flashings, gutters, and downspouts; steel window restoration; site fence restoration; 1st floor restoration/alterations; and asbestos and lead paint abatement. The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all labor, equipment and materials required by the specifications and the drawings referred to therein.Contract time shall be 210 consecutive calendar days from the effective date shown in the Notice to Proceed. Bidder must be qualified under Alabama Law and show current Certificate of Responsibility issued by the Alabama Licensing Board of General Contractors establishing their classification as to the value and type of construction on which they are authorized to bid. Bids shall show the Contractor's Certificate of Responsibility Number on the Bid envelope. Bids must be submitted in duplicate on the form included in the Project Manual and must be accompanied by a bid guarantee of at least five percent (5%) of the bid. Bidders shall also submit a current financial statement, if requested, by the Owner.The successful bidder will be required to furnish a Payment Bond and Performance Bond in the amount of one-hundred percent (100%) of the contract amount. No proposals may be withdrawn after the scheduled closing time.Awarding public contracts to non-resident bidders will be on the same basis as the non-resident bidder's state awards contracts to Alabama Contractors bidding under similar circumstances. Bid documents are being made available via paper copy and digital file. All plan holders are required to have a valid email address for registration. There is no charge to view documents online. Paper and digital bid documents can be purchased through the website. For questions regarding website registration or online orders, please contact Planhouse Printing at the number listed below. Planhouse Printing 607 W. Main Street Tupelo, MS 38804 662-407-0193.The Perry County Board of Commissioners reserves the right to reject any and all bids and to waive informalities whenever rejection is in the best interest of the owner.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.