Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 15, 2023

July 15, 2023

June 15, 2024

Multiple Locations

Renovation

No Information to Display

$1,344,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Montreal, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

*Award to be posted shortly Reference Number : 1725493 Deadline for receipt of complaints: 2023-05-29 Submission sent electronically accepted: Yes, in a single submission document Expected duration of the contract without the options (in months): 11 he works are divided into part 1 in mechanics and part 2 in electricity , they will start on June 26, 2023 . Below is a brief description of this work: Part 1 : Mechanical work : they include the work of decontamination and dismantling of the heating ducts as well as the ventilation of the enclosed space, this work must be completed no later than October 1, 2023, the heating system must be in operation from this date. Part 2: Electrical work: The electrical work outside the electrical room , which consists of replacing the secondary panels and the cables that connect them to the main panels, as well as the resulting architectural patching work, this work must be finalized no later than August 24, 2023 , from this date the electrical network must be in service. The electrical work inside the electrical room which consists of the replacement of the main panels, this work must be completed no later than March 29, 2024 . End Date 06/26/2023 Bid Bond 10 % is required ,Performance bond 50% is required.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects