Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 1, 2024

June 30, 2025

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, San Bernardino, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

On-Call Storm Maintenance Services, for the purpose of this RFQ includes the clearing, removal and disposal of debris of any type, the placement and installation of products to prevent erosion and/or displacement of sediment onto County roads and into District flood control facilities, and snow removal services. In the event of emergencies, rapid mobilization and performance of the work described herein is required. By its execution of this Contract, Contractor certifies that it is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq. as well as California Code of Regulations, Title 8, Section 16000 et seq. (Prevailing Wage Laws), which require the payment of prevailing wage rates and the performance of other requirements on certain public works and maintenance projects. Section 1720 of the California Labor Code states in part: For purposes of this paragraph, construction’ includes work performed during the design and preconstruction phases of construction including, but not limited to, inspection and land surveying work.If the Services/Scope of Work are being performed as part of an applicable public works or maintenance project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws The County and District reserve the right to change any of these dates. Any changes will be communicated in writing. Proposals will be accepted continuously from the RFQ release date to March 24, 2025; however, contracts will be awarded on a semi-annual basis. For all projects over $25,000, file a payment bond with and approved by the County Director or County Interim Director and/or District Chief Flood Control Engineer or District Interim Chief Flood Control Engineer, or their designees, in accordance with Civil Code section 3247, in a penal sum equal to one hundred percent (100%) of the contract price.File a performance bond as directed by the County Director or County Interim Director and/or District Chief Flood Control Engineer or District Interim Chief Flood Control Engineer, or their designees , in the Request for Bid in a penal sum equal to one hundred percent (100%) of the contract price. Question Deadline 10/19/2023.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects