Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 27, 2024

April 29, 2024

July 9, 2025

Multiple Locations

Site Work

No Information to Display

$6,749,668.00

Public - City

img_map_placeholder

Multiple Locations, Pharr, TX

112

22

11

4

Subscribe to View Full Documents

Project awarded to Mor-Wil, LLC in the amount of $6,749,668.03. This Project consists of eliminating three (3) lift stations by installing new sanitary sewer mains to convey flow by gravity. The Northwest Interceptor (15, 18, and 24-inch Sewer Main) eliminates Lift Station 29 and 33. The Central Interceptor (24-inch Sewer Main) eliminates Lift Station 1. The City of Pharr reserves the right to refuse and reject any or all bids and to waive any or all formalities or technicalities and to accept the bid to be the best and most advantageous to the City and hold the bids for a period of sixty (60) days without taking action. Conditional bids will not be accepted. This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. Payment and Performance Bonds shall be executed except in the event that the total amount bid is $50,000 or less, the successful contractor has the option to enter into a single payment contract with the City of Pharr in lieu of a Performance Bond. In the event that the total amount bid is $25,000 or less, the successful contractor has the option to enter into a single payment contract with the City of Pharr in lieu of a Payment and Performance Bond. Failure to execute contracts within the time specified shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security (bid bond) deposited with his bid. CLARIFICATION DEADLINE 02/15/2024 5:00 PM Electronic sealed bids addressed to Dr. Jonathan B. Flores, City Manager, City of Pharr, shall be received via the City e-bidding portal https://pharr.procureware.com. Bid opening shall also be available through Microsoft Teams: Meeting ID: 269 003 225 651; Passcode: 3SYrgN. Original, hard copy, emailed, and/or late submissions shall not be accepted. To view this solicitation and submit a bid, you must first register in the City bidding portal at https://pharr.procureware.com. Bidder must agree also to pay as liquidated damages the sum of five hundred dollars and fifty ($550) per day for each consecutive calendar day thereafter as provided in the general conditions. For more details of the DBE Program and the current, applicable fair share goals, please visit http://www.twdb.texas.gov/dbe. Bidder should visit the site of the proposed work and become fully acquainted with the existing conditions of the site and with the facilities involved, with a special consideration to the difficulties and restrictions attending the performance of the Contract.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.