Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 25, 2023

December 15, 2023

No Information to Display

915 W 9th St

Renovation

No Information to Display

$60,000.00

Public - City

img_map_placeholder

915 W 9th St, Dallas, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Trinity Basin Preparatory Tyler Street campus has an existing improvement which consists of 2 buildings; one constructed in 1978 and the other as an addition acting as the main building in 2001.Trinity Basin Preparatory is soliciting proposals for ROOF replacements at the main school building and gym on its newly acquired Tyler St campus.The new roof system should include a 20-year material warranty and a 2-year labor warranty. Contractor must provide services of an engineer licensed by the Texas Board of Professional Engineers. Roof Replacement & repairs - entire roof is approximately 33k sq ft TBP reserves the right to accept or reject any or all responses, waive any formalities or minor technical inconsistencies in a response, or reissue this solicitation or delete any items/requirements from this solicitation when deemed to be in TBP's best interest Trinity Basin Preparatory is soliciting proposals for a ROOF and HVAC replacements at the main school building and gym on its newly acquired Tyler St campus (915 West 9th Street Dallas, TX 75208). TBP has already engaged with a contractor to build a new 2-story 30,000 sq ft addition/structure attached to the North end of the existing building. Per owner this project was cancelled, and this will not re-bid.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.