Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 23, 2024

February 23, 2029

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Springfield, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project requires 20% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 2, 2023, at 10:00 AM at the Region Four/District Six Office in Springfield. Engineering Services are required for an engineering Project Manager. The Consultant Project Manager (PM) will manage/supplement various IDOT local agency processes and/or projects throughout District Six. The work may involve working directly with the local agency and/or its consulting firm. The Project Manager may also be asked to supplement various aspects of the Project Implementation in District Six. The work may involve working directly with contractors, suppliers and/or other entities doing business with IDOT. The selected Consultant and/or their Subconsultants on this project are prohibited from managing contracts where either party is the Prime Consultant or Subconsultant. The selected firm and/or their Subconsultants may not manage another firm if the relationship was reversed during another phase of work. At the negotiation meeting, the Prime Consultant and the Subconsultant(s) will disclose all previous/current involvement in the district, with local agencies, as well as current relationships with contractors/consultants. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 31 - RFQ - Project Implementation/local Roads Project Manager, Various Routes, Various Counties, Region Four/district Six.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects