Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 4, 2023

July 4, 2023

August 13, 2023

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Louisville, TN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The work consists of: Project A - Shoulder stone, shoulder maintenance, and D Mix as- phalt overlay on Holston College Road. Total overlay area = ap- proximately 15,254 s.y.; shoulder stone = approximately 15,254 linear ft.; shoulder maintenance = approximately 15,254 linear feet; pavement striping = approximately 7,627 linear feet. Project B - Shoulder stone, shoulder maintenance, and D Mix as- phalt overlay on Dug Gap Road. Total overlay area = approximately 15,840 s.y.; shoulder stone = approximately 15,840 linear ft.; shoul- der maintenance = approximately 15,840 linear feet; pavement striping = approximately 7,920 linear feet. All questions about the meaning or intent of the Contract Documents are to be directed to: Mayor P.O. Box 215 Louisville, TN 37777 Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda, mailed or delivered to all parties recorded as having properly requested and received the Bidding Documents. 5.2. Questions received less than six days prior to the bid opening date may not be answered. 5.3. Only questions answered by formal addendum shall be binding. Oral or other interpretations or clarifications will be considered without legal effect. 5.4. Addenda may also be issued to modify the Bidding Documents as deemed advisable by the Town The work described in these specifications consists of furnishing all labor, materials, tools, equipment and services and performing all work in accordance with these specifications for the following projects. 1.1.1. Project A - Shoulder stone, shoulder maintenance and asphalt overlay on Holston College Road. Refer to Bid Form D-1 for quantities and locations. 1.1.2. Project B - Shoulder stone, shoulder maintenance and asphalt overlay on Dug Gap Road. Refer to Bid Form D-1 for quantities and locations. 1.1.3. Project C - 2" Level/Compacted Stone with 2" Topping. Louisville Town Hall walking trail/playground parking lot. 1.1.4. Project D - Rumble Strips Old Lowes Ferry and Little Dug Gap Roads

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects