Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
July 20, 2023
August 21, 2023
No Information to Display
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - County
Multiple Locations, Macon, GA
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Notice is hereby given that Macon-Bibb County will receive responses to the Request for Qualifications Services for On-Call Paving and Repair Services for Macon- Bibb County. Bidders who do not attend the pre-bid meeting may still bid on the project. Deadline to submit questions is Friday, July 7, 2023, by 3:00 pm eastern time. All questions must be submitted via email to Lhardwick@outlook.com Bids to be considered shall be accompanied by a bid bond, payable to the Owner, in amount not less than five percent (5%) of the total base bid. This bid security shall become payable to the Owner only if the bidder, to whom award is made, should fail to execute a contract with the Owner and furnish bond and insurance in accordance with terms of the contract within ten (10) days after notification of award. Contractors interested in providing On-Call Paving and Repair Services shall develop a written proposal to include, but not be limited to, the following requirements. Provide all materials, equipment, and labor necessary for repairs and services for paving as needed by Macon-Bibb County. The successful contractor shall be expected to perform services on the infrastructure described herein this scope of work. 1. In general, the work consists of the removal of asphalt pavement to be patched (by milling or the squaring of the area by other means) and hauling away existing asphalt, stabilizing the base (compacting or ensuring that the base is stable) placing asphalt base (if base work is needed) and repaving with Hot Bituminous Pavement (HBP). The unit pricing shall consist of furnishing all labor, materials, and equipment necessary to complete the identified work area for various roadways throughout Macon Bibb County. 2. All work will be in accordance with the current GDOT specification at the time of the issued Work Order, unless otherwise negotiated. 3. In all cases, the Macon Bibb Project Manager will describe the work, location and timing requirements involved. This will involve the Macon Bibb Project Manager providing a listing of the work to be completed through the issuance of a Work Order. This listing will include location information such as: addresses and/or site maps indicating the Paving locations. A mutually agreed upon approach will be determined for each job. 4. Intersections and driveways shall be closed only for a minimum amount of time. Prior to initiation of construction, the Contractor shall coordinate driveway closures with property owners with final approval by the Macon Bibb Project Manager. This notification can be provided in writing. The Contractor will be responsible for proper backfill and compaction requirements of all excavations using suitable backfill material. The Contractor will be responsible for removal of construction material and debrisfrom each site at the end of each day's activity. 5. Contractor will be responsible for cutting and removing any pavement required during repair jobs. Asphalt shall be cut prior to removal. 6. The Contractor will be responsible for proper base preparation and after job completion. A Macon Bibb Representative will inspect the base preparation and final Asphalt Paving. All work must be inspected by the Macon Bibb Project Manager or his/her designer. 7. The Contractor shall protect all work areas and facilities from surface runoff. All areas and facilities subjected to flooding, regardless of the source of the water, shall be promptly dewatered. 8. It shall be the Contractor's responsibility to verify the actual location and elevation of all underground utilities prior to beginning work. 9. The Contractor shall make efforts to prevent or minimize erosion, sedimentation, and dust pollution.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Macon, GA
--
Macon, GA
Bid Date: Aug 09 2023
Macon, GA
Bid Date: Aug 18 2023
Macon, GA
Bid Date: Jun 15 2023
Macon, GA
Bid Date: Nov 09 2023
Macon, GA
Bid Date: Oct 12 2023
Macon, GA
Bid Date: Oct 17 2023
Macon, GA
Bid Date: May 05 2023
Macon, GA
Bid Date: Jul 25 2023
Macon, GA
Bid Date: Jul 25 2023
Macon, GA
Bid Date: Sep 04 2023
Macon, GA
--
Macon, GA
Bid Date: Jul 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
