Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 20, 2023

August 21, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Macon, GA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Notice is hereby given that Macon-Bibb County will receive responses to the Request for Qualifications Services for On-Call Paving and Repair Services for Macon- Bibb County. Bidders who do not attend the pre-bid meeting may still bid on the project. Deadline to submit questions is Friday, July 7, 2023, by 3:00 pm eastern time. All questions must be submitted via email to Lhardwick@outlook.com Bids to be considered shall be accompanied by a bid bond, payable to the Owner, in amount not less than five percent (5%) of the total base bid. This bid security shall become payable to the Owner only if the bidder, to whom award is made, should fail to execute a contract with the Owner and furnish bond and insurance in accordance with terms of the contract within ten (10) days after notification of award. Contractors interested in providing On-Call Paving and Repair Services shall develop a written proposal to include, but not be limited to, the following requirements. Provide all materials, equipment, and labor necessary for repairs and services for paving as needed by Macon-Bibb County. The successful contractor shall be expected to perform services on the infrastructure described herein this scope of work. 1. In general, the work consists of the removal of asphalt pavement to be patched (by milling or the squaring of the area by other means) and hauling away existing asphalt, stabilizing the base (compacting or ensuring that the base is stable) placing asphalt base (if base work is needed) and repaving with Hot Bituminous Pavement (HBP). The unit pricing shall consist of furnishing all labor, materials, and equipment necessary to complete the identified work area for various roadways throughout Macon Bibb County. 2. All work will be in accordance with the current GDOT specification at the time of the issued Work Order, unless otherwise negotiated. 3. In all cases, the Macon Bibb Project Manager will describe the work, location and timing requirements involved. This will involve the Macon Bibb Project Manager providing a listing of the work to be completed through the issuance of a Work Order. This listing will include location information such as: addresses and/or site maps indicating the Paving locations. A mutually agreed upon approach will be determined for each job. 4. Intersections and driveways shall be closed only for a minimum amount of time. Prior to initiation of construction, the Contractor shall coordinate driveway closures with property owners with final approval by the Macon Bibb Project Manager. This notification can be provided in writing. The Contractor will be responsible for proper backfill and compaction requirements of all excavations using suitable backfill material. The Contractor will be responsible for removal of construction material and debrisfrom each site at the end of each day's activity. 5. Contractor will be responsible for cutting and removing any pavement required during repair jobs. Asphalt shall be cut prior to removal. 6. The Contractor will be responsible for proper base preparation and after job completion. A Macon Bibb Representative will inspect the base preparation and final Asphalt Paving. All work must be inspected by the Macon Bibb Project Manager or his/her designer. 7. The Contractor shall protect all work areas and facilities from surface runoff. All areas and facilities subjected to flooding, regardless of the source of the water, shall be promptly dewatered. 8. It shall be the Contractor's responsibility to verify the actual location and elevation of all underground utilities prior to beginning work. 9. The Contractor shall make efforts to prevent or minimize erosion, sedimentation, and dust pollution.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.