Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 31, 2023

June 19, 2023

November 15, 2023

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Keene, NH

Subscribe to View Full Documents

The purpose of the Wilson Pond Dam Improvement Project is to reconstruct a portion of the existing dam so that it meets current dam safety regulations, which includes the ability to pass the 100-year flood event with a minimum of 1.0-feet of freeboard. In order to do so, this project consists of the excavation and removal of material on both the upstream and downstream sides of the existing dam, the demolition and installation of a new cast-in-place intake structure and reinforced concrete outlet pipe, the installation of a concrete hydraulic cut-off wall upstream of the original stonewall dam, raising of the earthen portions of the dam to contain the design flood, and the placement of a granular filter on the downstream side of the earthen portions of the dam. The project also includes traffic control measures on Arch Street. Two (2) lane travel is required at all times, and NHDOT approved traffic control measures are required. The Contractor is responsible for traffic control and shall prepare a traffic control plan, then coordinate with the NHDOT to review and obtain approval of the traffic control plan from NHDOT prior to mobilization. The control of water, including the bypass of discharges through the project site and into the downstream channel is required at all times. All construction shall be performed in the dry. Contractor shall submit a specific control of water plan to the Engineer and NHDES for review and approval prior to mobilization. Each BID must be accompanied by a certified check payable to the OWNER for five percent (5%) of the total amount of the BID. A BID BOND may be used in lieu of a certified check The anticipated Notice of Award is scheduled for May 31,2023 and the Notice to Proceed/Preconstruction Meeting will be scheduled for June 12,2023. Substantial Completion is October 4, 2023, and the date of readiness for final payment is November 8, 2023, a

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.