Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2023

October 9, 2023

September 28, 2025

To Be Determined

Addition, New Construction, Renovation, Site Work

No Information to Display

$100,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Redstone Arsenal, AL

Subscribe to View Full Documents

Construct a Propulsion Systems Laboratory consisting of modernization and expansion of existing facilities and construction of new stand-alone facilities to support RDT&E of propulsion systems and energetic propellants. Project includes the following: modernization of thirteen existing facilities (63,203SF), new facility for six new propellant mixing bays (4,673SF); water proofing of existing Earth Covered Magazines; new Maintenance Storage Facility (5,000SF); new Control Building (1,800SF); two new Data Acquisition Buildings (450SF EA); new Conditioning Building (600SF); new Rocket Motor Assembly Building (1,500SF); three new Inert Storage Buildings (1,200SF EA); and new Large Rocket Motor Segmenting/ Disassembly Facility (4,800SF). Work includes building information systems, fire protection and alarm systems, mass notification, access control, intrusion detection, energy monitoring and control systems, sustainability, and energy enhancement measures. Supporting facilities include site development, grading, parking, utilities, lighting, paving, walks, curbs, storm drainage, landscaping, signage, physical security, and AT/FP. Demolition of existing facilities will be required. Addendum #1-#6 have been issued as of 8-18-2023. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects