Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 30, 2023

September 30, 2023

September 30, 2024

1206 S Challis St

New Construction, Site Work

No Information to Display

$250,000.00

Public - Federal

img_map_placeholder

1206 S Challis St, Salmon, ID

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This Solicitation replaces Notice ID: 1282B123R0057 under Solicitation No. 1282B123R0057 that was originally a HUBZone set-aside. This Solicitation is a Total Small Business set-aside. The Salmon-Challis National Forest has an Aquatic Organism Passage project to replace an existing ford with a bridge. Work includes channel restoration, installation of a government furnished bridge on contractor provided abutments and the construction of bridge approach roadways. Rock and aggregate materials are available from government sources. Alternate (Commercial) sources proposed by the contractor will need to be approved for material suitability and weed free nature of the source. The contractor is responsible for the acquisition of the abutment materials per the attached plans and specifications along with the erection of the abutments. Government furnished materials are located at 3 locations in the vicinity of the project. The prefabricated bridge will be staged in Salmon, Idaho. The contractor is responsible for transporting the bridge to the work site. An instream work window of 7/15 to 8/15 has been established. All work within the ordinary high-water mark including de-watering, excavation and backfill, channel restoration and re-watering of the channel shall occur within this window. Refer to the attached Schedule of Items, Statement of work, Prelim Moyer Creek FSSS, Moyer Creek Final Drawings, Project Design features, , Moyer Creek Bridge Shop Drawings, Moyer Access map and Materials vicinity maps for specifications, drawings, requirements and locations. There is no Pre-Proposal site visit is planned. The location is open to the public and Offers are encouraged to visit the site on thier own. If there are questions, refer to the Q & A Moyer Site Visit_6.28.23 document and any further quesitons shall be addressed to Susan Kunath, Contract Specialist at susan.j.kunath@usda.gov . Proposals are due: August 30, 2023 at 1:00 p.m. CT. and are to be sent electronically to : Susan Kunath at susan.j.kunath@usda.gov. with the Offers name and Moyer Bridge in the subject line. Government's Contracting Point of Contact: Susan Kunath email: susan.j.kunath@usda.gov

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.