Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 29, 2023

December 16, 2023

October 2, 2024

SW-05-52-26-W3M

Addition, Demolition, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

SW-05-52-26-W3M, Greenstreet, SK

Subscribe to View Full Documents

The Work required for the New Secondary Cell at the Greenstreet Lagoon Located at SW-05-52-26-W3M south-east of the Hamlet of Greenstreet, Saskatchewan. - Line locates. - Grade stakes and as-built surveying will be completed by Clifton Engineering Group Inc. - Strip and stockpile topsoil. - Removal to stockpile and backfill of organic deposits. - Earth excavation compacted to embankment. - Clay excavation compacted to embankment for new secondary cell. - Internal access road with gravel surfacing. - New secondary cell with clay and synthetic liner. - Placement of piping for connection to existing lagoon system materials will be provided by the contractor. - Maintain lagoon operations throughout the duration of construction. A Performance Bond is required equal to 50% of Tender Price. Bid security is not required.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.