Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
June 27, 2023
January 8, 2024
No Information to Display
1555 Millcoe Rd
Renovation, Site Work
No Information to Display
No Information to Display
Public - City
1555 Millcoe Rd, Jacksonville, FL
The project has been placed on hold for an undetermined amount of time. While a firm construction timeline is undetermined at this time, construction is not expected to begin prior to the first quarter of 2024. JEA Solicitation Title: Arlington East WRF Expansion The purpose of this solicitation for Arlington East WRF Expansion (this "Solicitation") is to evaluate and select a vendor to provide furnishing all equipment, superintendence, labor, skill, material and all other Items necessary for the construction of the Arlington East WRF Expansion Phase 2 work as described in this Solicitation (the "Work") and to determine the best method for JEA to procure the Work with regards to pricing, quality, design, and workmanship. Arlington East WRF, 1555 Millcoe Rd, Jacksonville, FL 32211 Question Deadline 06/22/2023 For All Questions: Buyer: David King E-mail: kinggd@jea.com Project 135-11 Work 1. Construction of new Headworks, including new electrical room, mechanical screening equipment, washing compactors, screenings discharge system, effluent splitter box, and booster pump station. 2. New programmable logic controller (PLC) for Headworks. 3. Emergency generator with generator docking station and fuel tank south of Headworks structure. 4. Site preparation and grading for new structures. 5. Demolition of existing aerated grit structure and Splitter Box 1. 6. Mechanical and electrical demolition and modification to existing Screening Structure. 7. Associated lighting improvements. 8. Electrical duct bank demolition and relocations. 9. Associated instrumentation and controls 10. Non-potable water (NPW) system improvements including but not limited to: a. Duplex NPW filter feed pump system with flow meter. b. NPW Disk filtration system. c. NPW high service pumping replacement. d. Associated electrical and instrumentation improvements. e. Sequenced operations to maintain existing NPW operations while the replacement NPW components are constructed. f. Bypass operations to address construction sequencing restrictions. 11. Yard piping associated with the new Headworks including large facility influent force mains, PW and NPW to Headworks and new generator, primary clarifier influent piping to Primary Clarifier 3 and Primary Clarifier 4 and bypass piping from Headworks to new Splitter Box 2. 12. Yard piping associated with new NPW system improvements. D. Project 135-14 Work 1. Site preparation and grading for new structures. 2. Demolition of Primary Clarifier 1 and 2. 3. Demolition of existing Odor Control System 2, relocation of equipment, and construction of new Odor Control System 2. 4. Construction of Primary Clarifier 4, including new primary sludge pump station and scum pump. 5. Construction of new Splitter Box 2, including isolation gates, vertical mixer, and odor control. 6. Demolition of decommissioned Odor Control System 1, including removal of existing equipment, existing lighting, and electrical equipment. 7. Construction of new Aeration Basin 9, including NRCY pump, mixers, gates, diffused aeration system, piping and associated instrumentation. 8. Modifications to existing Aeration Basins 1 -8 including replacement of some existing instrumentation. 9. Hardwire all Profibus network Aeration Basins 1-8 instruments, air flow meters, and Aeration Basin 9 RAS flow meter. 10. Install new remote I/O units to accommodate modifications to instrumentation on Aeration Basins 1-8. 11. Modifications to RAS Metering Station 2 to accommodate new Aeration Basin 9. 12. Replacement of WAS Pumps 1 and 2 and associated mechanical improvements. 13. Mechanical modifications and improvements to existing yard piping including primary clarifier effluent piping from Splitter Box 2 to Aeration Basins 1 through 9.. 14. Demolition of Splitter Box 1 and Splitter Box 2. 15. Blower modifications, including two multi-stage centrifugal new blowers, five newblower control panels and associated electrical and instrumentation and controls modifications. 16. Miscellaneous improvements to three existing blowers. 17. New programmable logic controller (PLC) for blowers and aeration system. 18. Fiber-optic cable relocations. 19. Associated lighting improvements. 20. Electrical duct bank demolition and relocations. 21. Associated instrumentation and controls. 22. Bypass piping and bypass pumping to maintain operations during construction. Final Completion: [1180 days] CSI Geo Project No.: 71-21-117-02 Hazen & Sawyer Project No.: 42011-020 Agreement No.: 181306 JEA PROJECTS 8003776 AND 8004916
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Jacksonville, FL
Bid Date: Aug 09 2023
Jacksonville, FL
Bid Date: Aug 09 2023
Jacksonville, FL
--
Jacksonville, FL
--
Jacksonville, FL
--
Jacksonville, FL
Bid Date: Aug 23 2023
Jacksonville, FL
Bid Date: Sep 20 2023
Jacksonville, FL
--
Jacksonville, FL
Bid Date: Aug 17 2023
Jacksonville, FL
--
Jacksonville, FL
Bid Date: Aug 07 2023
Jacksonville, FL
Bid Date: Aug 24 2023
Jacksonville, FL
Bid Date: Aug 24 2023
Jacksonville, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
