Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

January 1, 2024

June 30, 2024

480 N Mountain View Ave

Service, Maintenance and Supply

No Information to Display

$80,000.00

Public - State/Provincial

img_map_placeholder

480 N Mountain View Ave, San Bernardino, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

SCOPE OF WORK : A. The intent of this Agreement is for the Contractor to provide window tint and blinds replacement services in accordance with the following: 1. Remove all existing exterior window tint film. 2. Apply new interior window tint film. 3. Remove and replace the current blinds with new vertical standard valances. 4. The Contractor will dispose of and haul away all related trash and debris from the site. B. The Contractor will be expected to provide any or all of the following during the term of this Agreement: 1. Inspections pertaining to window tint and blinds replacement. 2. Consultation/planning on best method to achieve the intended result. 3. Identify and report to the EDD Representative any safety hazard, faulty equipment, or other condition encountered during the course of the work at the EDD office which the Contractor determines needing repair or replacement. 4. The Contractor shall comply with all state, EDD, and local office policies and procedures while on the premises. C. All work shall be completed in compliance with any related drawings and specifications, and shall comply with all applicable building codes, regulations and ordinances. For final acceptance, all work areas shall be complete and ready for occupancy; all equipment shall be installed, connected and in operating condition, and all utility connections shall be complete and accepted by the city, county or state authority having jurisdiction. D. The Contractor must have a valid D-52 State Contractor’s License. Licenses shall be furnished by the Contractor in accordance with applicable local ordinances and state and federal laws regarding labor on public buildings and specifications contained in this Agreement. Should any specification in the Agreement fail to comply with such ordinances and laws, the Contractor shall be required to comply with such statutes at no extra cost to the EDD. E. Travel time will be at the Contractor’s expense. All employees shall be paid prevailing wage.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects