Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 14, 2023

May 15, 2023

September 15, 2023

Weiland Rd

Demolition, New Construction, Paving, Site Work

No Information to Display

$166,478.00

Public - City

img_map_placeholder

Weiland Rd, Damascus Township, PA

Subscribe to View Full Documents

As of May 2, 2023. Project has been awarded to Rutledge Excavating amounting $166,477.80. DAMASCUS TOWNSHIP BID NOTICE The Board of Supervisors are accepting bids through PennBid at www.pennbid.net for the following project: Weiland Bridge Replacement. Bids are due on April 14, 2023, by 1:00 PM and expected to be awarded at the regular Board meeting, April 17, 2023, at 7 PM, 60 Conklin Hill Road, Damascus PA. 570-224-4410. Remove temporary bridge, bridge onto owners trailer. Install new bridge abutment walls. Install new bridge into place. Repair stone walls into new abutments. Install Riffles in stream bed as per plans. Remove existing 15" culvert. Install new 15" culvert as per plan. Install crushed stone approaches. Remove temporary by-pass. Township to pick up by-pass culvert pipe and concrete blocks used in temporary stream crossing. Install guard rail W provided, on bridge. All workmanship to be preformed according to current PennDot 408 Specifications. Bridge structure to be provided and installed according to manufactures specifications & engineers site plan. DAMASCUS TOWNSHIP, WEILAND ROAD, T-521. Located off of Township Barkley Lake Road, T-626. The bridge is located approximately 4 tents of a mile from intersection of Barkley Lake Road. Project Number: WEILAND BRIDGE 2023 Estimate: Under $130,000.00 CLARIFICATION DEADLINE 4/12/2023 1:00 PM

55 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects